Commercial VRF, heat pump systems & precision climate control.
Schools, hotels, residential developments, and commercial buildings across London. Designed for net zero and installed to perform. Toshiba, Daikin, and Mitsubishi systems, from specification through handover.
Commercial installations
Schools, hotels, residential developments, and commercial buildings. Real projects, real performance. Each system installed to deliver net zero alignment and high seasonal efficiency.
Elthorne Park High School
Four independent VRF systems installed across the building, each with heat recovery capability. Eight roof-mounted outdoor units condition 72 classroom zones independently, allowing for granular temperature control across different teaching areas.
Westheath Place, Golders Green
Super heat recovery VRF system installed in residential retrofit. Twelve independently controlled ducted zones throughout the building, enabling zone-specific comfort whilst maintaining excellent part-load efficiency. System prioritised net zero alignment and year-round performance.
Christ the King Church
Complete boiler replacement with modern air source heat pump system. Retrofitted to deliver both heating and domestic hot water for the church's year-round needs. System configured for low-noise operation and minimal aesthetic impact, with independent zone control for sanctuary and adjoining spaces.
Why modern systems matter
Commercial heat pump and VRF systems perform radically differently from legacy boiler systems. Here's what the numbers mean.
VRF, heat recovery & commercial chillers
VRF & Heat Recovery
Variable Refrigerant Flow systems don't work like domestic split A/C. Each zone is independently controlled and can run heating or cooling simultaneously. In winter, zones that need heating draw outdoor air — zones needing cooling recycle internal heat. This simultaneous operation is why heat recovery VRF systems achieve COPs of 4+.
Commercial buildings — schools, offices, hotels — often have different needs in different areas. VRF is built for this.
- Independent zoning: 70 zones can run at 70 different temperatures
- Heat recovery: Waste heat from cooling zones feeds heating zones
- Part-load efficiency: Runs at optimal efficiency at 20% load or 100% load
- Ductwork: Uses standard ducted infrastructure, fits into ceiling voids
Chillers & Commercial Scale
When people think "heat pump," they often think domestic heating only. Commercial chillers do both — they heat and cool simultaneously. A chiller serving a large building can be pulling heat from one section while cooling another, all on the same system.
This is the opposite of traditional boiler + AC splits. It's more efficient, simpler to maintain, and it's the direction commercial building services are moving.
- Simultaneous H/C: Heating and cooling on one system, one refrigerant circuit
- High capacity: Suitable for 20+ kW to 500+ kW installations
- Net zero compatible: Pairs directly with renewables and storage
- Reduced footprint: One outdoor unit instead of separate boiler and A/C plant
Commercial boiler installation
For projects where boiler systems remain the right choice — retrofit constraints, existing infrastructure, specific load profiles — we install and commission gas condensing and hybrid systems. Installation-focused: specification, first fix, second fix, commissioning, and handover packs.
What we handle
Commercial boiler specification and installation across London. We work with existing building services, coordinate with other trades, and deliver full compliance documentation at handover.
- System design & specification against building load
- First and second fix installation & pipework
- Gas Safe certification & commissioning
- Control integration & zone balancing
- Handover documentation & warranty registration
- Training for building management team
When boilers remain right
We don't fit boilers into every project — heat pumps are the better solution in most cases. But for some installations, boilers make sense:
- Existing high-temperature heating infrastructure
- Buildings with no outdoor space for heat pump units
- Rapid replacement in emergency scenarios
- Hybrid systems during transition phases
- Projects where peak load justifies gas redundancy
Request a site survey
Tell us about the building, the space, and the system you need. We'll come back with a visit date and a fixed proposal within one week.